Free Updates
Let us tell you when new posts are added!
Email:
Click to subscribe via RSS
Navigation
Log Homes Network
Blog Home
Building a Dream Blog
Log & Learn Blog
Categories
April, 2008 (2)
March, 2008 (1)
February, 2008 (2)
January, 2008 (2)
December, 2007 (2)
November, 2007 (2)
October, 2007 (2)
September, 2007 (5)
August, 2007 (5)
July, 2007 (8)
Breaking Ground
Choosing a Producer
Construction
Creating the Floor Plan
Design Decisions
Excavation
Financing/Appraisal
Framing
Land Selection
Search
Archives
<
May 2008
>
Sun
Mon
Tue
Wed
Thu
Fri
Sat
27
28
29
30
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
5
6
7
More Links
Building A Log Cabin blog
Golden Eagle Log Homes
Project 955--Orcas Island
Friday, February 29, 2008
Progress Continues
Posted by dirttodone
Progress on the family's lakehouse is continuing. Below are some of the latest pictures.
This is a photo of the loft bathroom. The round top window is in the bedroom area. The bathroom vanity will be on the wall straight ahead.
All cleaned up and ready for the insulation to come in.
Great room fireplace framed in. After insulation is complete the ProLine Baileys Harbor Stone will be applied. Note the two openings on the left of the fireplace unit. The one on the bottom is for firewood storage; the top arched opening will be for a decorative lighted display shelf.
Note: The hearth is tall enough for sitting comfortably and warming yourself.
This is the prowside windows being installed. The walkout basement below will have two patio doors.
It might not look like a tub shower module but under the protective cardboard it is. Before the home is insulated, all the rough wiring, rough plumbing and rough framing must be done.
Construction
2/29/2008 12:52:37 PM (Eastern Standard Time, UTC-05:00)
Comments [0]